Reference project

Refinery

Energy recovery

Refinery

The energy contained in the regenerator's flue gas can be used via a turbo-expander to drive a generator. The gas pressure in the regenerator must be kept stable. In the event of fluctuations or disturbances in the power grid, a very fast switchover from expander to bypass operation may be necessary.

Requirements

  • Fast differential-pressure control at the regenerator
  • Switchover between turbo-expander and bypass
  • Automatic start of the expander
  • Synchronisation of the generator to the power grid
  • Speed or power control of the turbo-expander

A similar task?

Talk to our project engineers about your application.

Get in touch All projects